batalpha Bobach


batalpha Bobach GmbH & Co., Langenfeld

Engineering and installation of the switchgear (approx. 30 meter) for the control of the main stage Lower and upper ground machinery of the Royal Opera House in London, GB.
- Engineering of the switchgear
- Delivery of the switchgear



batalpha Bobach GmbH, Langenfeld

Engineering and installation of the switchgear for the control of the drive units for the main stage and underground machinery of the concert hall in Kassel, Germany
- Engineering of the switchgear
- Manufacturing of the terminal boxes
- Delivery and installation of the switchgear
- Modification and extension of the existing switchgear


batalpha Bobach GmbH, Langenfeld

Engineering and installation of the switchgear for the control of the main stage drives of the concert hall in Halle, Germany
- Engineering of the switchgear
- Delivery and installation of the switchgear